Nottingham Express Transit
The future of Nottinghams public transport was unveiled in 2004. Premier Cable Installations had installed & terminated the power cables to supply the entire network, on and off street, for the 14.5 km track, with minimal disruption to local residents and motorists. Our contract included the logisitcs of each operation over a 12 month period. This included liasing with traffic management and the co-ordination of the cable deliveries to ensure a smooth running installation, which hit every deadline set, throughout the year long project.